As part of TKB’s retainer contract with the University of Illinois at Urbana Champaign, TKB has completed work on UIUC’s Education Building with an elevator upgrade and restroom renovation. TKB’s work first developed a scope of work that fit within the available funds and priorities by working with the project team’s cost estimator and University’s Facilities and Services Department.  The constructed scope focused on expanding women’s restrooms, the creation of an additional all-gender restroom, and full modernization of both elevators. The building now has fully accessible vertical transportation and renovated, code-compliant accessible women’s and all-gender toilet rooms, meeting current code requirements within a fifty-six-year-old structure. The construction expanded the women’s restroom capacity to better match current student demographics.

Maintaining functional use of the building throughout construction was the most significant project challenge, requiring consecutive modernization of the north and south elevators. Continuous access to an operating elevator and toilet rooms was achieved by overlaying two critical path tracks for long elevator lead times and the toilet room renovations.  One of the men’s restrooms was temporarily converted to women’s use to facilitate simultaneous renovation of all women’s toilet rooms.